Team Elmer's
Home » Projects »

 

Job Type

Jobs 

Years


 

Archives for 2018

South Airport Road Reconstruction

South Airport Road is one of the most travelled roadways in Traverse City and is routinely operating at or above capacity. After years of heavier-than-anticipated traffic, South Airport Road from US-31 to Veterans Drive was in need of a complete reconstruction. Team Elmer’s came in as the low bidder on the project and was ready to take on the challenges.


Cherry Capital Airport

The East-West Runway 10/28 at Cherry Capital Airport in Traverse City, Michigan dates back to a time when airports across the country were building shorter runways. At 6,500 feet, it was a bit too short for large commercial jets to take off with full capacity flights. The problem was especially pressing in the summertime, thanks to the heat and density of the air. After decades of planning, Cherry Capital Airport had to decide on a solution. In order for runway 10/28 to provide enough length for capacity jets to take off in the heat of summer, it needed to be over 7,000 feet long.

 


St. Ignace 1-75 Reconstruction

On a recent job in St. Ignace, Michigan, Team Elmer’s crews were a long way from home. Over 80 miles of road and bridge stretched between the Team Elmer’s offices in Hillman and the project worksite in St. Ignace, in Michigan’s Upper Peninsula. The distance proved challenging as Team Elmer’s crews worked to rebuild a deteriorated one-mile stretch of I-75.


 

Job Type

Jobs 

Years