Team Elmer's

Field Load Testing

Team Elmer's can load test piles to determine and verify that design capacity has been achieved. This testing is a typical requirement for commercial projects.

Most projects are designed by a structural engineer for pier placement and load calculations. Soil borings are often recommended to determine pier type and depth requirements.

 

 

 

Saving the Wall

Team Elmer's installed 71 tiebacks – and a custom bracket to rescue a northern Michigan condo development's wood retaining wall.