Crossing the River: Reynolds Road

Team Elmer's has put the finishing touches on the Honor-based Reynolds Road Bridge, which spans 72 feet across the Platte River. The project, which was made possible through generous grants from the Grand Traverse Band of Chippewa and Ottawa Indians, the Environmental Protection Agency, and the Conservation Resource Alliance, will help to eliminate washouts into the Platte River.


Deadstream Road

Picture the site: Deadstream Road, a gorgeous old two-lane roadway in Benzie County that connects US-31 and M-22. The road itself is short—only about 4.43 miles between those two major northern Michigan highways. For many local residents, though, it’s long been one of the most beautiful drives in the area. Tranquil and serene, the road runs through a heavily wooded area, with some of the biggest and most established trees dating back as far as 150 years.


Digging Deep on State Street

Spring and early summer 2015 saw Team Elmer's working in downtown Charlevoix, where an MDOT project called for a major project on a key city street. The project demanded the replacement of water and sewer lines for a three-block stretch of the city's State Street. While the work didn't put Team Elmer's on Bridge Street -- Charlevoix's busy main drag -- it did place is just one block over on another busy road. 


Earth Shelter Project Michigan

Earth sheltering is the architectural practice of using earth against building walls for external thermal mass, to reduce heat loss, and to easily maintain a steady indoor air temperature.


East Bay Park: E-Coli Removal

Elmer’s got to work in late April, implementing a trio of three-step filtration systems that will greatly cut back on bacterial contamination and keep problems like “Raccoon-gate” from recurring in the future.


East Grand Rapids Public Works Complex: Auger Cast Piles

Our Team tested two auger cast piles prior to starting in order to verify the pile design was correct and could hold a 40-ton pile. We then inserted points into the ground and on the building, installing a laser level measurement apparatus to ensure building integrity during installation. Numerous overhead lines and underground utilities required additional patience, and every plane of the construction site demanded diligence.


East Jordan Locomotive Relocation

East Jordan, MI was looking at revamping some parks and decided they wanted to move the engine closer to the highway for more people to see. The challenge was lifting the train and transporting it over the bridge. Two Team Elmer’s cranes made the journey from Traverse City to East Jordan to move the almost 200,000 pound piece of history.


East Jordan: Water & Sewer Improvement

Team Elmer’s might encounter unforeseen obstacles when completing a project, but we never get bogged down. Such was the case in East Jordan, where we broke up the soil – and the project into two parts.


Elberta Road Construction

Team Elmer’s completed reconstruction of the .93-mile road, including a complex and meticulously timed, seven-staged process that had to ensure all businesses and homes remained open throughout.


Evanston, Illinois Sewer Rehabilitation

 Team Elmer’s battled tight working conditions twenty feet underground to line more than 120 feet of 80-year old sewer pipes and grout and coat 10 four-foot diameter manholes.


Gaylord Streetscape

 Working alongside a team of subcontractors, Team Elmer’s excavation crews took to a pair of Downtown Gaylord streets—Main Street and South Otsego Avenue—to remove deteriorating curb and gutter and begin work on the revitalization. The job involved everything from full reconstruction and restoration of the outdated storm sewer and gutter systems to placement of new sidewalks. Paving and concrete work—including decorative concrete—was necessary to construct new sidewalks in accordance with the Gaylord Streetscape plan, as were new ramps compliant with the Americans with Disabilities Act.


General Mills Yoplait Production Facility: Auger Cast Piles

The ground-breaking expansion project launched on the heels of an announcement from General Mills that the company had signed agreements with partner companies to acquire a 51 percent controlling interest in the Yoplait brand and a 50 percent interest in a related company that holds the worldwide Yoplait brands of products for approximately $1.1 trillion.


Records 13 - 24 of 80 — Jump to page First 1 2 3 4 5 6 7 Last
 